Powering On The System - Brocade Communications Systems ICX 7250 Hardware Installation Manual

Table of Contents

Advertisement

2.
Second device in stack
3.
Third device in stack

Powering on the system

After you complete the physical installation, you can power on the system.
NOTE
The power outlet should be installed near the equipment and should be easily accessible.
1.
Remove the power cord from the shipping container.
2.
Install the power cord clip.
3.
Attach the AC power cord to the AC connector on the rear panel.
4.
Insert the power cord plug into a 100V-240V outlet.
NOTE
To turn the system off, simply unplug the power cord or cords.
62
Brocade ICX 7250 Switch Hardware Installation Guide
Installation
53-1003898-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents