Powering on the system

Powering on the system
1. Ensure that all power supplies are fully and properly inserted and no power supply slots are
uncovered.
CAUTION
Never leave tools inside the chassis.
2. Remove the power cord from the shipping package.
3. Attach the AC power cable to the AC connector on the rear panel.
4. Insert the power cable plug into a 115V/120V outlet.
NOTE
To turn the system off, simply unplug the power cords.
NOTE
The socket should be installed near the equipment and should be easily accessible.
NOTE
If the outlet is not rated 115/120V, stop and get the appropriate cable for the outlet.
DANGER
The intra-building port or ports of the equipment or subassembly is suitable for connection
to intra-building or unexposed wiring or cabling only. The intra-building port or ports of the
equipment or subassembly MUST NOT be metallically connected to interfaces that connect
to the outside plant (OSP) or its wiring. These interfaces are designed for use as intra-
building interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE, Issue 5) and
require isolation from the exposed OSP cabling. The addition of Primary Protectors is not
sufficient protection in order to connect these interfaces metallically to OSP wiring.
NOTE
Before crimping the ground wire into the provided ground lug ensure the bare copper wire has been
cleaned and antioxidant is applied to the bare wire. To ensure adequate bonding when attaching
the ground lug, a minimum of 20 PSI of torque is required to be applied to the mounting hardware
used to attach the ground lug.

Operation verification

After you have installed any redundant power supplies, verify that the device is working properly by
plugging it into a power source and verifying that it passes its self test.
If your device has more than one power supply installed, repeat this procedure for each power supply.