The 4-Post Rack Assembly Consists Of; The 2-Post Rack Assembly Consists Of; Site Preparation; Setup Location, Rack And Appliance Precautions - Polycom PDS 725-78600-002A2 Getting Started Manual

Polycom digital signage server getting started guide
Table of Contents

Advertisement

Site Preparation

Site Preparation
Polycom, Inc.
Hardware Kit: screws, cone washers, and cage nuts (from left to right)
8 (Eight) M5 x 12 flat head screws
2 (Two) 10-32 x 3/4" pan head screws
22 (Twenty-two) M4 x 4 truss head screws
8 (Eight) M5 x 12 cone washers
10 (Ten) M5 Cage nuts
NOTE: Use the hardware supplied with your specific rack if different from the
hardware supplied in this kit.

The 4-post rack assembly consists of:

A set of long, fixed rack brackets that attach directly to the rack itself.
A set of medium-sized adjustable rack brackets that attach to the long,
fixed rack brackets.

The 2-post rack assembly consists of:

A set of long, fixed rack brackets.
Three sets of short rack brackets that attach to the long fixed rack brackets.
One of these sets has threaded holes (for placement in the front) to allow
the appliance to be secured in the rack.

Setup location, rack and appliance precautions

Elevated Operating Ambient - If installed in a closed or multi-unit rack
assembly, the operating ambient temperature of the rack environment
may be greater than room ambient. Therefore, consideration should be
given to installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the manufacturer.
Polycom Digital Signage Server Hardware Setup
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pds 2000

Table of Contents