Turb 555 / Turb 555 IR
ba41113e07
04/2009
9 Align the cuvette.
1
10 Press the
During the calibration step, the
bols flash. The lower display line shows the remain-
ing measuring cycles until the end of the calibration
step.
11 Wait until the calibration step is finished.
In the lower display line, the instrument asks you to
insert the next calibration standard (10.0K = 10000
NTU).
12 Insert the 10000 NTU calibration standard into the
cuvette shaft.
13 Align the cuvette.
1
14 Press the
During the calibration step, the
bols flash. The lower display line shows the remain-
ing measuring cycles until the end of the calibration
step.
15 Wait until the calibration step is finished.
The instrument asks you to insert the next calibration
standard (100.0 = 100 NTU).
key.
c
key.
c
Operation
s
and
sym-
s
and
sym-
41