wtw Turb 555 Operating Manual page 26

Turbidity
Table of Contents

Advertisement

Operation
Preparatory
activities
Installing the pour-
through vessel
26
Switch on your instrument before installing the pour-through
vessel. Thus, the warm-up period of your instrument will be
over after the installation and you will be able to start mea-
suring immediately (warm-up period, see section
3.3 S
WITCHING ON THE MEASURING INSTRUMENT
Turb 555 / Turb 555 IR
).
ba41113e07
04/2009

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turb 555 ir

Table of Contents