Operation
32
15 Attach the tubes to the flow-through vessel by screw-
ing the nuts to the threads of the flow-through vessel.
When doing so, observe the marking of the threads:
in = inlet, out = outlet.
16 Attach a clamp (6 and 8, not contained in the scope
of delivery) to the inlet hose and outlet hose each.
17 Connect the hose ends to the sample inlet and drain.
Hoses for the inlet and outlet
Diameter (inside):
Diameter (outside):
CAUTION
The drain must be pressure-free to avoid damage to the
tubing system!
Note
The flow-through vessel can remain installed until the next
calibration.
Note
If you use the flow-through vessel, you do not need to rinse
the cuvette 3x with the sample. The sample rinses the cu-
vette as it flows through. Even the forming of air bubbles is
considerably reduced.
Turb 555 / Turb 555 IR
Diameter
4.75 mm
8 mm
ba41113e07
04/2009