CONFIGURING COM OPTION B: BACNET MS/TP WITH MODBUS TCP/IP CHAPTER 7: COM OPTION B: BACNET MS/TP WITH MODBUS TCP/IP
Note
NOTE
7–10
• Max Info Frames - this is the maximum number of information frames the node is
allowed to send before it needs to pass the token.
• Max Master - this is the highest allowable address for master nodes (cannot be
higher than 127); a Max master greater than 36 is recommended for data sets.
9.
Click the Advanced button to display additional settings.
We recommend you do not change any Advanced settings.
10. Click OK to process your changes.
11. Click Activate Configuration from the left side of the webpage to implement any
changes you made. You will see the page shown below.
12. Click the Confirm button to process the changes. You will see the message shown
below (the IP Address shown in the link is just an example).
13. The meter resets. Connect the meter Ethernet cable to your Network (remove it from
your PC). You can now connect to the meter through your Network using the new IP
address.