GE
Grid Solutions
6.1
Programming Using the Faceplate
EPM 2200 POWER METER – INSTRUCTION MANUAL
EPM 2200 Power Meter
Chapter 6: Using the Meter
Using the Meter
You can use the Elements and Buttons on the EPM 2200 meter face to view meter
readings, reset and/or configure the meter, and perform related functions. You can also
use the GE Communicator software to configure the meter through communication.
The following sections explain meter programming, first by using the faceplate and then
with GE Communicator software.
The EPM 2200 meter can be configured and a variety of functions can be accomplished
simply by using the Elements and the Buttons on the meter face. Complete Navigation
Maps can be found in Appendix A of this manual.
6–1