Post-Connection Check - Endress+Hauser Liquicap M FTI51 Operating Instructions Manual

Capacitance point level
Hide thumbs Also See for Liquicap M FTI51:
Table of Contents

Advertisement

Liquicap M FTI51, FTI52
Endress+Hauser
4.10

Post-connection check

After wiring the measuring device, carry out the following checks:
• Is the terminal assignment correct?
• Is the cable gland tightly sealed?
• Is the housing cover screwed on all the way?
• If a power supply is present:
If the device is operational, the green LED flashes at 5-second intervals.
Wiring
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liquicap m fti52

Table of Contents