Installation Instructions - Endress+Hauser Liquicap M FTI51 Operating Instructions Manual

Capacitance point level
Hide thumbs Also See for Liquicap M FTI51:
Table of Contents

Advertisement

Liquicap M FTI51, FTI52
!
Endress+Hauser
3.3

Installation instructions

3.3.1
Installation
Liquicap M FTI51 (rod probe) can be installed from above, from below and from the side.
Liquicap M FTI52 (rope probe) can be installed vertically from above.
Note!
• The probe may not come into contact with the container wall!
• Recommended distance from the container floor: 10 mm.
• If multiple probes are mounted next to each other, a minimum distance of 500 mm
(19.7 in) between the probes must be observed.
• Do not install probes in the area of the filling curtain!
• Make sure the probe is at a sufficient distance from the agitator.
• If there are strong lateral loads, use rod probes with a ground tube.
For electrically conductive tanks e.g. steel tanks
≥500 (19.7)
MAX
Dimensions mm (in)
For nonconductive tanks e.g. plastic tanks
MAX
Probes with ground tube and grounding (Dimensions mm (in))
MIN
MIN
Installation
MAX
L00-FTI5xxxx-11-06-xx-xx-001
MAX
MIN
L00-FTI5xxxx-11-06-xx-xx-002
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liquicap m fti52

Table of Contents