Finishing The Work; Transferring The Machine - Hakki Pilke OH 27 Instructions For Assembly, Operation And Maintenance

Table of Contents

Advertisement

26 (39)

Finishing the Work

1. Make sure there is no firewood in the splitting chute or on the conveyor belt.
2. Stop the power take-off of the tractor.
3. Slightly lift the machine with the lifting mechanism of the tractor and move the
machine by approx. 0.5 m. Make sure that the conveyor does not hit anything.
4. Clean the machine, base and conveyor of wood waste.
5. Slowly lower the machine onto the ground and bring the conveyor into the
transport position (page 9).

Transferring the Machine

When transferring the machine with a tractor:
- the conveyor must be in the transport position;
- the cross-cut cradle must be locked into the transport position as shown below;
- the necessary horizontal and vertical clearances required by the machine and
conveyor must be observed. Also check that there are no persons or animals around
the machine;
- the transportation must be carried out at such a low speed that no damage can occur
to the machine, tractor or anything along the route;
- no extra items can be carried on top of the machine and conveyor.
Machine Maintenance
Note! The machine must always be disconnected from the power source
(articulated shaft, electrical cable or both) before service!!!
Hakki Pilke 27
Original
Version 5-2014

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents