21 Control panel assembly
22
* except NL (see instructions delivered with the water low safety
pressure-sensitive switch)
- Carefully unroll and take out the various bulbs from the control
panel, passing them through the opening in the front cover.
23 Electrical connection
All connections are made with the terminal boxes designed for that
purpose on the back of the boiler's command board.
Connections must be made by a qualified technician.
02/04/08 - 300016854-001-A
(1) Front - (2) Rear
Position the control panel in the rear bushes.
Open the control panel by unscrewing the 2 screws on the front
of the panel.
- Then, insert the bulbs inside the pocket and maintain them with the
spring.
- At the front, screw the control panel to the cover using 2 self-
tapping screws Ø 3.9x12.7 + serrated washers (Phillips
screwdriver).
P 420
19