REMEHA P 420 Assembly Instructions Manual page 17

Hide thumbs Also See for P 420:
Table of Contents

Advertisement

17 Boilers supplied with an assembled body
.
18
500
Boiler
Front
P 420-8
1
P 420-9
1
P 420-10
1
P 420-11
1
P 420-12
1
P 420-13
1
P 420-14
1
package
RB2
02/04/08 - 300016854-001-A
Insulation width, boiler body
500
600
-
-
1
1
1
-
1
-
2
1
2
-
2
-
MP4
MP5
(1) Rear
- Unscrew the screw A on the bracket.
To fit the flow controller, refer to stage no. 11.
Affix the lower casing supports (packages RB2, MP2 and MP5)
to the frame using 1 screws HM8x25 + serrated washer for each
support.
Insert the boiler body insulation panels. Hold the insulation in
place by knotting each strap to the lower casing support on either
side of the boiler
800
900
Rear
-
1
-
-
1
-
-
1
-
-
1
-
-
1
MP2
MP3
P 420
17

Advertisement

Table of Contents
loading

Table of Contents