REMEHA P 420 Assembly Instructions Manual page 18

Hide thumbs Also See for P 420:
Table of Contents

Advertisement

19
20
Boilers supplied with an assembled body: Fit the upper crosspieces (See step 9), then:
Put the left and right cable ways in place, respecting the assembly sequence.
Secure the cable ways (3 screws HM5x25 + serrated washers).
Secure the front top panel (package RB2) with 4 screws HM5x25 + serrated washers.
18
Insert the rear insulation - Package R B2.
P 420
02/04/08 - 300016854-001-A

Advertisement

Table of Contents
loading

Table of Contents