Step 9: Connect The Engage Cable To Ac Junction Box - enphase M250 Installation And Operation Manual

M-series enphase microinverter
Hide thumbs Also See for M250:
Table of Contents

Advertisement

Enphase Microinverter Installation and Operation

Step 9: Connect the Engage Cable to AC Junction Box

a. Connect Engage Cable into the AC branch
circuit junction box using an appropriate gland or
strain relief fitting. The Engage Cable requires a
strain relief connector with an opening of 1.3 cm
(0.5 inches) in diameter.
b. Connect the Engage Cable into additional AC
junction boxes as needed to transition to conduit
between smaller sub-arrays.
Refer to the schematics located on page 40 for
more information.
Single-phase 230 Vac
(acts as equipment earth)
Balanced 400 Vac (3-phase) is accomplished by alternating phases between microinverters as shown:
WARNING: Risk of electric shock. Treat all connector contacts as though they are live. The 400 Vac Engage
Cable drop connector contains two live phases.
22
L1 - Brown
(not present)
(not present)
Neutral - Blue
Earth – Green / yellow
 2016 Enphase Energy. All rights reserved.
Three-phase 400 Vac
L1 - Brown
L2 - Black
L3 - Grey
Neutral - Blue
Earth – Green / yellow
(acts as equipment earth)
141-00024 Rev 02b

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

M215

Table of Contents