Maintenance And Cleaning - ACME AE-610 BEAM User Manual

Saber mini
Table of Contents

Advertisement

7. Maintenance and Cleaning

Maintenance:
A. As the pictures shown above, please replace the cable or cable joints immediately once they've
turned yellow.
B. Do maintain the fixtures every two months and make sure that all the screws and terminals
have been locked firmly to make sure the normal performance of the fixtures. Negligence of
maintenance would cause malfunction of the fixture.
Cleaning:
The cleaning of internal and external optical lenses and/or mirrors must be carried out
periodically to optimize light output. Cleaning frequency depends on the environment in which the
fixture operates: damp, smoky or particularly dirty surrounding can cause greater accumulation of
dirt on the unit's optics.
 Clean with soft cloth and use normal glass to clean fluid.
 Always dry the parts carefully.
 Clean the external optics at least every 20 days. Clean the internal optics at least every 30/60
days.
Ballast
17A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents