LOAD side of the circuit breaker facing the AC line filter. Install the circuit breaker using
the previously removed fasteners.
8. Install wire connections as follows for the 120 VAC and 240 VAC models:
a. 120 VAC: On 120 Vac treadmills connect the blue wire from the input module to
the LINE terminal on the circuit breaker and the blue wire from the AC line filter to
the LOAD terminal on the circuit breaker.
b. 240 VAC: On 240 Vac treadmills connect the blue wire from the input module to
the upper LINE terminal on the circuit breaker and the blue wire from the AC line
filter to the upper LOAD terminal on the circuit breaker. Connect the brown wire
from the input module to the lower LINE terminal on the circuit breaker and the
brown wire from the AC line filter to the lower LOAD terminal on the circuit
breaker.
9. Set the AC input panel in its mounting position and install using the previously removed
fasteners.
10. Plug in the power cord and Switch the input power ON.
11. Verify treadmill operation per
to service.
.See Also
"Replacement Procedures" on page 29
(Undefined variable: TRM700-16Base.ServiceManualTitle)
""Operation Verification Procedure" on page 8
5 Replacement Procedures
Circuit Breaker Replacement
and return
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents