Wavetek ANT-20 Operating Manual

Advanced network tester
Hide thumbs Also See for ANT-20:
Table of Contents

Advertisement

Quick Links

ANT-20SE
Advanced Network Tester
ANT-20 NEXT
Network Expert Test Software
BN 3035/95.40
Software Version 2.00
Operating Manual
9

Advertisement

Table of Contents
loading

Summary of Contents for Wavetek ANT-20

  • Page 1 ANT-20SE Advanced Network Tester ANT-20 NEXT Network Expert Test Software BN 3035/95.40 Software Version 2.00 Operating Manual...
  • Page 2 Please direct all enquiries to your local Wavetek Wandel Goltermann sales company. The addresses are given at the end of this handbook. Copyrights This product or parts of it are based upon Recommendations and/or Standards of the Standardization Sector of the International...
  • Page 3: Table Of Contents

    Introduction ANT-20 NEXT software........I-1 About this operating manual .
  • Page 4 Connecting the items under test ..... . O-1 Starting the ANT-20 NEXT software ....O-2 Evaluating and recording the diagnosis .
  • Page 5: Introduction

    The “ANT-20 NEXT” software can be run as an alternative to the standard graphical user interface of the ANT-20. All you need to do to perform a measurement is select the type of path to be tested. All the important measurements for characterizing and quality analysis of the path are then performed automatically.
  • Page 6: About This Operating Manual

    ANT-20 NEXT ANT-20SE About this operating manual Overview Chapter Contents • This chapter describes how to start using the “ANT-20 NEXT” software on the “Getting started” ANT-20. • This chapter contains an overview of the pre-defined applications, separated “Standard Applications”...
  • Page 7: Getting Started

    ANT-20 NEXT Getting started Installing the ANT-20 NEXT software If the “ANT-20 NEXT” software has not been installed on your ANT-20 yet, you can use the installation disks to install the software yourself. To install the “ANT-20 NEXT” software The ANT-20 is switched on.
  • Page 8 You can start the “ANT-20 NEXT” software at any time by clicking on them. Enabling the software If you install the “ANT-20 NEXT” software on your ANT-20 yourself, you will need to enter the access code supplied with the software when you start the software for the first time. The dialog window for entering the access code will not be displayed the next time that you start the “ANT-20 NEXT”...
  • Page 9: Backup

    ANT-20SE ANT-20 NEXT Backup The “ANT-20 NEXT” software is stored in the following directories on the hard disk of the ANT-20: Fig. G-3 Directory structure You can generate or change the following files: • Report files containing measurement results (file name extensions: *.htc, *.htm, *.htr, *.hts) •...
  • Page 10 ANT-20 NEXT ANT-20SE Notes: Getting started...
  • Page 11: Standard Applications

    Table SA-1 Overview of standard applications Note: How to start the “ANT-20 NEXT” software, load an application and perform a diagnosis is described in the “Operating” Chapter: • Section 1 “For users in a hurry”, Page O-1 • Section 2 “For advanced users”, Page O-9...
  • Page 12: Basic Information On Running Applications

    The “ANT-20 NEXT” software first determines the type of line. The ANT-20 is then automatically set correctly for subsequent measurements. To determine the line type, the TX signal of the ANT-20 (setting: TX clock internal) is offset by 10 ppm and the received clock signal measured.
  • Page 13 If the line operates with “re-timing”, the ANT-20 is automatically set to “Clock from RX”. This ensures that the line clock and the clock signal transmitted by the ANT-20 are identical. This setting avoids sporadic bit slips (ANT-20: LSS) that occur as a result of slight differences in the two clock signals.
  • Page 14: Performing Optional Measurements

    ANT-20 NEXT ANT-20SE 2.1.2 Performing optional measurements Once the line has been typified completely, you can make further measurements to test the line quality according to the selected application. The following measurements can be performed (using 2 Mb/s as example): •...
  • Page 15: Applications For 2 Mbit/S Signals

    “Monitoring 2 Mb/s, full check (approx. 25 min)” application. Tip: If the item under test is not equipped with a PMP socket, you can connect the ANT-20 to a “hot” line using a probe (e.g. TKD-1 from Wavetek Wandel Goltermann).
  • Page 16 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 17: Line 2 Mb/S, Unknown Structure

    ANT-20SE ANT-20 NEXT Line 2 Mb/s, unknown structure Analysis of a 2 Mbit/s line with unknown properties Fig. SA-2 Analysis of a 2 Mbit/s line with unknown properties Special features If the properties of the line are unknown, a measurement to determine the type of line present is performed first.
  • Page 18 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 19: Line 2 Mb/S, Pcm31Crc, Terminated & Re-Timing

    Typical line parameter Explanation Frames Re-timing Termination for FAS and CRC FAS and CRC errors are not returned to the ANT-20 via the loop back. CRC-4 / E bit detection Every inserted CRC-4 error must be acknowledged by an E bit error.
  • Page 20 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 21: Line 2 Mb/S, Transparent (Unframed), No Re-Timing

    Typical line parameter Explanation Frames Not applicable Re-timing Clock pulling range > ±50 ppm All measurements are performed with the “ANT-20 TX clock from RX” setting. Termination for FAS and CRC Not applicable CRC-4 / E bit detection Not applicable...
  • Page 22 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 23: Applications For 34 Mbit/S Signals

    ANT-20SE ANT-20 NEXT Applications for 34 Mbit/s signals Most of the applications described in the following sections are also available as “quick check” versions. Monitoring 34 Mb/s, full check (approx. 25 min) Monitoring an unknown 34 Mbit/s signal Fig. SA-3...
  • Page 24 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 25: Line 34 Mb/S, Unknown Structure

    ANT-20SE ANT-20 NEXT Line 34 Mb/s, unknown structure Analysis of a 34 Mbit/s line with unknown properties Fig. SA-4 Analysis of a 34 Mbit/s line with unknown properties Special features If the properties of the line are unknown, a measurement to determine the type of line present is performed first.
  • Page 26 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 27: Line 34 Mb/S, Transparent (Unframed)

    ANT-20SE ANT-20 NEXT Line 34 Mb/s, transparent (unframed), full test (approx. 25 min) Commissioning a transparent 34 Mbit/s communications line Use the “Line 34 Mb/s, transparent (unframed), full test (approx. 25 min)” application if you want to commission a transparent 34 Mbit/s line.
  • Page 28 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 29: Applications For Stm-1

    (RX) for the “Monitoring STM-1, full check (approx. 25 min)” application. Note: If you want to feed high power (> 0 dBm) optical signals into socket [17], use the (optional) built-in power splitter of the ANT-20 or another attenuator to reduce the level. Measurement The “ANT-20 NEXT”...
  • Page 30 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 31: Line Stm-1, Unknown Structure

    ANT-20SE ANT-20 NEXT Line STM-1, unknown structure Analysis of unknown STM-1 lines Fig. SA-6 Analysis of unknown STM-1 lines Special features If the properties of the line are unknown, a measurement to determine the type of line present is performed first. After this, measurements that apply to the type of line detected will be performed.
  • Page 32 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 33: Line Stm-1 Vc-4, Full Check (Approx. 25 Min

    ANT-20SE ANT-20 NEXT Line STM-1 VC-4, full check (approx. 25 min) Commissioning of STM-1 VC-4 communications lines Use the “Line STM-1 VC-4, full check (approx. 25 min)” application if you intend to commission a STM-1 line with VC-4 containers. If the desired or required properties of the line to be tested are known, a check is first made to see if these properties are present.
  • Page 34 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 35: Line Stm-1, Digital Radio, Full Check (Approx. 25 Min

    ANT-20SE ANT-20 NEXT Line STM-1, Digital Radio, full check (approx. 25 min) Commissioning STM-1 radio links Use the “Line STM-1, Digital Radio, full check (approx. 25 min)” application if you want to commission a STM-1 digital radio link. If the desired or required properties of the line to be tested are known, a check is first made to see if these properties are present.
  • Page 36 If alarms occur or limit values are exceeded, a brief explanatory text is displayed in the “Possible Causes” field of the “ANT-20 NEXT - [Application]” window. A more detailed cause description and further information can be displayed if you double-click on the item of interest and the necessary information is stored in the “knowledge database”.
  • Page 37: Operating

    Operating “Operating” is divided into two sections: • Section 1 “For users in a hurry” describes how you can use the “ANT-20 NEXT” software to perform a pre-defined measurement application. • Section 2 “For advanced users” describes the software functions in detail. This section is aimed at users who want to customize, edit or expand the “ANT-20 NEXT”...
  • Page 38: Starting The Ant-20 Next Software

    This entry window is not displayed again when the “ANT-20 NEXT” software is started again. The first time that you start the “ANT-20 NEXT” software on the ANT-20, you must enter the access code. See under “Starting the ANT-20 NEXT software for the first time” for details.
  • Page 39 The “ANT-20 NEXT Welcome” window opens. Fig. O-1 “ANT-20 NEXT Welcome” window 2. Click on the “Start” button if you want to try out the “ANT-20 NEXT” software. This activates the 30-day evaluation period. Please note the information on page O-2. – or –...
  • Page 40 The “ANT-20 NEXT - [Application]” window opens with the last application that was selected. The name of the last application that was loaded is shown in the title bar, e.g.: “ANT-20 NEXT - Line 2 Mb/s PCM31CRC, terminated & re-timing, quick test (< 5 min)”. Fig. O-4 “ANT-20 NEXT - [Application]”...
  • Page 41 ANT-20SE ANT-20 NEXT 2: Load and start a new application 1. Click the “Load” button under the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Load Application” window opens. Fig. O-5 “Load Application” window 2. Select the desired application from the “Applications” field.
  • Page 42 Measurements assessed as “OK” and results that correspond with expectations Red: Incorrect measurements or results that contradict expectations Yellow: Warnings Indicators after diagnosis Fig. O-8 “ANT-20 NEXT - [Application]” window with “Save Report - [Application name]” window after diagnosis Operating...
  • Page 43 – FAIL (red) if faults were detected by the diagnosis – ABORT (yellow) if the diagnosis was terminated prematurely • “Ready” or “Abort” is shown next to “Diagnosis” in the “ANT-20 NEXT - [Application]” window: – Status LED green No faults diagnosed –...
  • Page 44: Evaluating And Recording The Diagnosis

    ANT-20 NEXT ANT-20SE Evaluating and recording the diagnosis Viewing the report 1. Click on the “View” button in the “ANT-20 NEXT - [Application]” window. An external HTML viewer window opens with the report of the diagnosis. Fig. O-10 Diagnosis report display 2.
  • Page 45: For Advanced Users

    ⇒ Click on the “Programs/ANT-20 NEXT/ANT-20 NEXT” menu item in the Start menu The “ANT-20 NEXT” software will load with a standard application. Each time the “ANT-20 NEXT” software is started again, it will load the application that was selected when it was last used.
  • Page 46: Loading An Application

    You must load a pre-defined application or an application you created yourself in order to perform a diagnosis. The following sections describe the various methods of selecting and loading an application. Note: You cannot start more than one application of the “ANT-20 NEXT” software at a time. 2.2.1 Automatically loading the last application selected The “ANT-20 NEXT”...
  • Page 47: Loading An Application With The Load Menu Item In The Application Menu

    “Application” menu with display of the last five applications loaded ⇒ Click on one of the items under “Edit” (up to 5) in the “Application” menu of the “ANT-20 NEXT - [Application]” window, e.g. “Line 2 Mb/s, PCM31CRC, terminated & re- timing, full test (approx. 25 min)”.
  • Page 48: Creating A New Icon (Shortcut

    The “ANT-20 NEXT” software will start with the specified application. You can use this method to create an icon (shortcut) for each application that you require. The shortcut can be created using the Windows Explorer if you are using an ANT-20 equipped with a touchscreen.
  • Page 49: Starting The Diagnosis

    3. Click on “OK”. The diagnosis starts. The label for the “Start” button (green) in the “ANT-20 NEXT - [Application]” window changes to “Abort” (red). All buttons and menus are disabled except the “Abort” button.
  • Page 50: Aborting A Diagnosis

    • The “Save Report - [Application name]” window shows the message “ABORT” (yellow) to indicate that the diagnosis was stopped prematurely. • “Abort” is shown next to “Diagnosis” in the “ANT-20 NEXT - [Application]” window. • The status LED next to “Diagnosis” will turn yellow.
  • Page 51: Reporting The Results

    The “ANT-20 NEXT” software can generate high-quality measurement reports as HTML files. This section describes how to use these reports. 2.5.1 Viewing the report ⇒ Click on the “View” menu item in the “Report” menu in the “ANT-20 NEXT - [Application]” window. Fig. O-20 “Report” menu –...
  • Page 52: Report Structure

    ANT-20 NEXT ANT-20SE 2.5.1.1 Report structure Fig. O-22 Report display in HTML viewer (report header) Every report is made up from the following sections: • Header • Line Parameters • Assessment • Measurements • Test Status • Settings (details page) •...
  • Page 53 The “Settings” section lists all the settings that the ANT-20 used to perform the measurements. These settings are important when you want to revert to interactive operation of the ANT-20 to investigate specific problems. You can read the required settings directly from this section and thus avoid making errors when setting the ANT-20.
  • Page 54 Text color Explanation • Explanatory text and headings Black • The diagnosis has been assessed as a “PASS” by the “ANT-20 NEXT” software. Meaning when the line type is being determined: No contradiction of the expected parameters was detected. Meaning when a measurement is made: No limit values were exceeded.
  • Page 55: Saving The Report

    The “logo.gif” file for the company logo must also be saved in the same directory. Note: If you want to copy a report from the ANT-20 to another PC, you must copy all four files and the “logo.gif” file. If you do not copy all the files, the error message “Broken Links”...
  • Page 56: Loading A Report

    2.5.3 Loading a report To display a report for evaluation, proceed as follows: 1. Click on the “Load” menu item in the “Report” menu in the “ANT-20 NEXT - [Application]” window. – or – Click on the “Load” button (under “Report”).
  • Page 57: Creating And Customizing Applications

    The following sections describe how you can create and customize a new application. 2.6.1 Creating a new application 1. Click on the “New” menu item in the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Define New Application” window opens.
  • Page 58: Customizing An Application

    Customizing the basic parameters (Basics) The application that you want to customize is loaded. 1. Click on the “Edit” menu item in the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Edit Basics - [Application name]” window opens.
  • Page 59 Customizing diagnostic evaluation The application that you want to customize is loaded. Expert mode is activated. 1. Click on the “Edit” menu item in the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Edit Basics - [Application name]” window opens.
  • Page 60 Expert mode is activated. The text files with the longer descriptions of the error causes have been saved. 1. Click on the “Edit” menu item in the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Edit Basics - [Application name]” window opens.
  • Page 61 ANT-20SE ANT-20 NEXT Fig. O-32 “Manage Causes - [Application name]” window The single line descriptions of all available error causes are listed in the “Possible Causes” field in the “Manage Causes - [Application name]” window. 3. Click on the item in the “Possible Causes” field that you want to customize.
  • Page 62 To set a parameter The application that you want to customize is loaded. Expert mode is activated. 1. Click on the “Edit” menu item in the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Edit Basics - [Application name]” window opens.
  • Page 63 To deactivate or activate measurements The application that you want to customize is loaded. Expert mode is activated. 1. Click on the “Edit” menu item in the “Application” menu in the “ANT-20 NEXT - [Application]” window. The “Edit Basics - [Application name]” window opens.
  • Page 64: Saving A (New) Application

    “ANT-20 NEXT - [Application]” window. The application will be saved under its existing file name. Note: Applications that have been provided by Wavetek Wandel Goltermann cannot be overwritten. In such cases, the “Save” menu item has the same effect as the “Save As”...

This manual is also suitable for:

Ant-20e

Table of Contents