Mitsubishi Electric Q62DAN User Manual page 151

Melsecq series
Hide thumbs Also See for Q62DAN:
Table of Contents

Advertisement

7 ONLINE MODULE CHANGE
7 - 27
(3)
Mounting of new module
(a)
Mount the dismounted module and new module to the other system.
(b)
Using the G(P).OGLOAD instruction, save the user set values to the CPU
device. Refer to Appendix 2.2 for the G(P).OGLOAD instruction.
(c)
Using the G(P).OGSTOR instruction, restore the user set values to the
module. Refer to Appendix 2.3 for the G(P).OGSTOR instruction.
(d)
Dismount the new module from the other system, mount it to the slot from
where the old module was dismounted in the original system, and install the
terminal block.
(e)
After mounting the module, click the [Execution] button and make sure that
the "RUN" LED is lit. Module ready (X0) remains off.
(4)
Operation check
(a)
To make an operation check, click the [Cancel] button to cancel control
resumption.
(b)
Click the [OK] button to leave the "Online module change" mode.
MELSEC-Q
7 - 27

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents