Insert the bottom foam packaging piece (PFT-PACK4) into the bottom of the outer
8)
carton packaging kit (PFT-PACK3) and place onto the pallet (PFT-PALLET), which
is also supplied in the Repack Kit.
NOTE: The marks indicating the front have two cut outs.
Place the plastic bag (PFT-BAG) onto the bottom foam packaging piece and open
9)
the bag.
Gently insert the PFT into the bottom foam piece. Locate and lift the instrument,
10)
using the hand-hold positions on the bottom and back of the PFT. This requires
two people to lift the instrument.
AMETEK Brookfield
Page 70
Cut Outs
Bottom Foam Packaging
Piece
Manual No. M09-1200-F1016
Need help?
Do you have a question about the PFT Powder Flow Tester and is the answer not in the manual?