Section 11
Testing functionality by secondary injection
154
and the voltages that are related to them:
2
V
Z
I
R
=
×
=
t FwdZ
,
FwdZ
t
FwdR
EQUATION14052 V1 EN
2
V
Z
I
R
=
×
=
+
t RvsZ
,
RvsZ
t
RvsR
EQUATION14053 V1 EN
The previous calculations are in primary values. They are transferred to secondary values
to perform injections by a test set. Primary values are transferred to secondary values by
taking into account the CT ratio and the VT ratio (respectively 9000/1 A and 13.8/0.1 kV
in the example).
The magnitude of the secondary voltages, that are related to the points RE and SE of the
R-X plane, needs to be checked.
RE (R
, X
):
FwdR
FwdX
V
VT s
,
V
V
11931
=
×
=
t FwdZs
t FwdZ
,
,
V
VT p
,
EQUATION14054 V1 EN
SE (R
, X
):
RvsR
RvsX
V
VT s
,
V
V
5899
=
×
=
t RvsZs
,
t RvsZ
,
V
VT p
,
EQUATION14055 V1 EN
The tests, which are described in this section, may require voltages that have magnitude
equal to 110% of the previous values. The continuous permissive overload voltage of the
protection voltage channels of the TRM module is 420 V; so the previous voltages may be
applied to the analog channels of the IED continuously. Limitations may be related to the
available test set; the current I
maximum value 4) in order to reduce the magnitude of the test voltage for the points RE
and SE.
Test sets usually do not have a feature to simulate a real network during a power swing and
apply the related analog quantities at the terminal of the generator. The scope of the
present test is not a simulation of a real network. Voltages and currents are supplied in
order to measure an impedance that changes in the time and traverses the plane R-X and,
in particular, the area inside the lens characteristic. The test may be performed by
applying:
Symmetric three-phase voltage at 50 Hz. The magnitude depends on the point of the
characteristic that needs to be verified. The following three main points of the line
segment SE-RE need to be checked:
2
2
X
I
0 078
.
0 565
.
+
×
=
+
FwdX
t
2
2
X
I
0 003
.
0 282
.
×
=
+
RvsX
t
0 1
.
V
86 45
.
×
=
13 8
.
0 1
.
42 75
.
V
×
=
13 8
.
was calculated by using a factor 2.5 (instead of the
t
1MRK 504 165-UUS -
2
20918 0 570 0 20918 11931
.
×
=
×
=
2
20918 0 282 2 20918 5899
.
×
=
×
=
Transformer protection RET670 2.2 ANSI
Commissioning manual
V
(Equation 12)
V
(Equation 13)
(Equation 14)
(Equation 15)