Commissioning and Operation

WARNING: Be aware that only qualified personnel must connect the Enphase Microinverter
to the utility grid.
WARNING: Ensure that all AC and DC wiring is correct. Ensure that none of the AC and DC
wires are pinched or damaged. Ensure that all AC junction boxes are properly closed.
WARNING: Connect the Enphase Microinverter to the utility grid only after receiving prior
approval from the electrical utility company.
NOTE: The Status LED on the underside of each microinverter will blink green six times to
indicate normal start-up operation approximately one minute after DC power is applied.

Commissioning

To commission the Enphase Microinverter PV system:
1. Turn ON the AC disconnect or circuit breaker for each microinverter AC branch circuit.
2. Turn ON the main utility-grid AC circuit breaker. Your system will start producing power after a
five-minute wait time.
3. The Enphase Microinverters will begin communicating over the power lines to the Envoy. The
time required for all microinverters to report to the Envoy will vary with the number of
microinverters in the system. The first units should be detected within 15 minutes but the entire
system could take hours to detect.
4. The M215 has field adjustable voltage and frequency trip points. If adjustments are required by
your local utility, the installer can use the Envoy to Manage the Grid Profile after all
microinverters have been detected.
For more information on Envoy operation, refer to the

Operating Instructions

The Enphase Microinverter is powered on when sufficient DC voltage from the PV module is applied. The
Status LED of each microinverter will blink green six times to indicate normal start-up operation
approximately one minute after DC power is applied. You may need to use a handheld mirror to view
indicator lights on the undersides of the microinverters.
20