A Recommended technique for working on a
slope.
1. Adjust the engine speed from idling to an intermediate
speed.
2. Unlock the lock levers and pull in the bucket and hold
the bucket about 20 to 40cm above the ground.
(1) Lock lever
(A) "Unlock"
(B) "Lock"
(A) 20 to 40 cm
EXCAVATOR OPERATION
3. Activate the dozer control lever to raise the dozer.
(1) Dozer control lever
(2) Dozer
(A) "Raise"
(B) "Lower"
21