Double-Checking The Physical Installation; Power Up And Verify; Figure 36: Vpm And Tcm Cards - Imagine communications Selenio VMG-14+ Hardware Setup Manual

Table of Contents

Advertisement

Installation Instructions
Video Processing Module, and Transcoding Modules
Slot Assignment: VMG chassis-front, any slot in the range 3 to 14
Use guidelines in
card(s) or TCM or TCM2 or TCM2+ cards
Figure 36.
VPM and TCM Cards
VPM Card
Thumbscrew
Front
Thumbscrew
Double‐Checking the Physical Installation
Ensure that all modules are firmly seated.
Ensure that the thumb screws for all modules are tightly secured.
Caution:
Ensure that Imagine Communications-supplied filler panels are installed in empty slots. This
is necessary to maintain proper airflow and prevent air from escaping out of the front of an
open slot.
Power Up and Verify
1. On a DC System, connect power to the PEMs. 
On an AC System, set the circuit breaker of each AC PEM to be used to the ON position.
2. Monitor the boot-up process, which proceeds as follows:
All of the LEDs on the SCM, the Fan Trays, the PEMs, the VPMs, the TCMs, and the NPMs
-
illuminate.
Selenio
TM
VMG-14+ Hardware Setup Guide
"Inserting VMG Modules—New System" on page 41
(Figure
to place and secure the VPM
36).
TCM Card
Rear
Thumbscrew
Front
Thumbscrew
Gen2 Release 1.4.0
Rear
50

Advertisement

Chapters

Table of Contents
loading

Table of Contents