CHAPTER 3
Physical Installation
This chapter provides the necessary information for installing the Selenio VMG into a rack and
applying power. Please read this entire chapter before beginning the installation procedure.
Successful completion of this installation readies the system for the initial configuration.
In This Chapter:
"Site Preparation,"
•
"Electrostatic Discharge (ESD) Prevention" on page
•
"Unpacking and Inspection" on page
•
"Installation Instructions" on page
•
Site Preparation
Imagine Communications recommends that the VMG operations site be prepared as described in the
following topics:
"Tools and Equipment,"
•
"Site Equipment" on page
•
"Personnel" on page
•
Tools and Equipment
The installation guidelines in this manual use the following tools, which you should provide at your
installation site.
3/8" box wrench, socket wrench, or nut driver to attach cables to the DC PEM.
•
5/16" screwdriver and suitable screws to rack mount the chassis.
•
Cable ties and cable clamps to secure power cords and signal cables.
•
An anti-static pad or treatment if installing on vinyl composite tile, linoleum, or carpet.
•
Site Equipment
The installation guidelines in this manual require the following equipment at the operations site:
An equipment rack: EIA compliant 19":
•
The rack must be accessible from the front and rear for installation.
-
Ensure that any stabilizers that came with the equipment rack have been installed before
-
mounting the chassis in the rack.
See also
-
For DC power:
•
TM
Selenio
VMG-14+ Hardware Setup Guide
in next section.
40.
in next section.
36.
37.
"Rack Requirements" on page
39.
39.
"Site Space Requirements" on page
•
"Rack Requirements" on page
•
"Power Connectivity" on page
•
37.
37.
37.
38.
36