Flueing options
Horizontal terminations (mock chimney)
Dimensions are in mm unless otherwise stated
255
20
400
Important notes
For the horizontal flue terminal to comply with the required flue clearances, and to fit
under a 2.4 m eave, the maximum the fire can be installed above the floor is 400 mm.
Check clearances first before installation.
The horizontal run of flue pipe must have a 20 mm rise for every 1 m towards the flue
termination. NEVER allow the flue pipe to run downwards towards the flue terminal. A
downwards slope can trap heat and become a fire hazard.
The horizontal flue length must not be greater than the vertical.
32 ¦ Ember Installation Guide: 12890-A 01-17
2 m max.
4
3
Important
The horizontal flue length must
not be greater than the vertical.
3
245-410*
Flue cowl slides depending on wall thickness
2
1
5 & 6
Flue components
1. Ember adaptor (R3653)
Refer p. 30 for clearance to
combustible information for
the Ember adaptor.
2. Mock chimney horizontal
flue kit (R3654)
3. Flue pipe(s) 150-1000 mm
4. Flue elbow 90 ° (R3643)
Max. number of 90 ° bends
= one.
5. Horizontal flashing kit
(R3646)
6. Horizontal wall terminal
(R3650)