Seagull Models SEAX139 Assembly Manual page 10

Table of Contents

Advertisement

SHOESTRING 25e EP
3) Slide the speed control into the fuse-
lage with the battery wires, receiver lead
and switch going in and through the tie-
wrap. Position the speeed control, then
tighten the tie-wrap to secure the speed
control in the fuselage. The heat sink will
face the top of the fuselage.
4) Connect the wires from the motor to
the wires of the speed control. Use a tie-
wrap ( not included) to secure the leads
so they don't interfere with the operation
of the motor or installation of the cowl-
ing.
10
Instruction Manual.
5) Route the battery lead through the
opening in the fuselage. The lead for the
receiver is routed under the battery tray
and receiver, then plugged into the throt-
tle channel of the receiver. Mount the
switch from the speed control in the fu-
selage where it can be accessed when the
canopy is removed.
Receiver.
6) Secure the battery in the fuselageusing
a hook and loop strap. Also, place hook
and loop tape on the battery and fuselage
where they contact each other to prevent
the battery from moving.
Battery.

Advertisement

Table of Contents
loading

Table of Contents