Seagull Models SEAX139 Assembly Manual page 7

Table of Contents

Advertisement

M2 clevis.
Hex nut.
Fuel tubing.
Repeat steps to install the remaining ai-
leron control horn and pushrod.
INSTALLING THE MAIN LANDING
GEAR TO FUSELAGE.
1) The blind nuts for securing the land-
ing gear are already mounted inside the
fuselage.
WWW.SEAGULLMODELS.COM
2) Using the hardware provided, mount
the main landing gear to the fuselage.
3) Place the fuselage inverted on the
workbench in a suitable stand. Set the
landing gear in place and use a screw-
drive to secure the landing gear to the fu-
selage using bolts M4x15mm and wash-
ers. Make sure to use the threadlock on
the bolts so they don't vibrate loose.
Thread locker glue.
C/A glue.
M4x15mm
4) Use hobby scissors and a hobby knife
to trim the landing gear fairings. Leave
the size of the fairings slightly over-sized.
M4x15mm
7

Advertisement

Table of Contents
loading

Table of Contents