Mitsubishi Electric RD77MS2 User Manual page 48

Melsec iq-r series simple motion module
Hide thumbs Also See for RD77MS2:
Table of Contents

Advertisement

■Wiring process of SSCNET cable
Put the SSCNET cable in the duct or fix the cable at the closest part to the Simple Motion module with bundle material in order
to prevent SSCNET cable from putting its own weight on SSCNET connector. Leave the following space for wiring.
• Putting in the duct
Top of panel or wiring duct
RD77MS
5 mm (0.20 inch)
*2
or more
*1 For wiring duct with 50 mm (1.97 inch) or less height. For other cases, 40 mm (1.58 inch) or more.
*2 20 mm (0.79 inch) or more when the adjacent module is not removed and the extension cable is connected.
• Bundle fixing
Optical cord should be given loose slack to avoid from becoming smaller than the minimum bend radius, and it should not be
twisted. When laying cable, fix and hold it in position with using cushioning such as sponge or rubber which does not contain
plasticizing material.
Panel
5 WIRING
46
5.1 Precautions for Wiring
RD77MS4
RUN
ERR
3
1
AX
AX
4
2
5 mm (0.20 inch)
or more
RD77MS
Base unit
Bundle material
Recommended product
NK clamp SP type (NIX, INC.)
Base unit
30 mm
(1.18 inch)
or more
*1
Panel
70 mm
(2.76 inch)
or more
Optical cord
Loose slack
Cable
80 mm
(3.15 inch)
or more
119 mm
(4.69 inch)
Door

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rd77ms4Rd77ms8Rd77ms16

Table of Contents