Heatrun Test - Toshiba PORTEGE R200 Maintenance Manual

Personal computer
Hide thumbs Also See for PORTEGE R200:
Table of Contents

Advertisement

3 Tests and Diagnostics
3.4
To execute this program, select 3-Repair heatrun (T&D) in the startup menu, press
Enter.
When selecting the option you want to execute, the message shown below will appear and
01-ROM Checksum of the SYSTEM test will be executed.
After selecting this test, the same subtests as 3.23 Running Test are executed successively.
For more details on the procedure and test content, refer to Running Test.
When the heatrun test ends, following message appears in the display.
************************************************
************************************************
Press any key to continue...
Press any key and return to the startup menu.
NOTE: The test result (Errorlog.txt) is stored in the floppy disk. The result is displayed
3-12
Downloaded from
www.Manualslib.com

Heatrun Test

SYSTEM TEST NAME
SUB-TEST
: XX
PASS COUNT : XXXXX
WRITE DATA : XX
ADDRESS
: XXXXXX STATUS
HEATRUN TEST END
in the same format as Log Utilities. For more details of the format, refer to 3.22
Log Utilities.
[CONFIDENTIAL]
manuals search engine
XXXXXX
xxxxxxx DIAGNOSTIC TEST VX.XX
[Ctrl]+[Break] : test end
[Ctrl]+[C]
ERROR COUNT: XXXXX
READ DATA
: XX
: XXX
PORTEGE R200 Maintenance Manual (960-519)

3.4 Heatrun Test

: key stop

Advertisement

Table of Contents
loading

Table of Contents