APPENDIX B: INSTALLING AND CONNECTING DNP3 I/O MODULES

DNP3 I/O module (LV) connection to the Power Source

D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
Connect the power supply to the last DNP3 I/O module in the chain.
The cable from J2 on the last DNP3 I/O module to the power source (GE part number 977-
0500) provides the connections shown in the wiring diagram of Figure 71.
Figure 71: Power cable 977-0500 wiring diagram
DB9 Male
1
2
Not Connected
3
4
+ DC
5
- DC
6
7
Not Connected
8
9
Power Supply
+ V
- V
GE INFORMATION
179