GE Multilin D400 Instruction Manual page 177

Substation gateway
Hide thumbs Also See for Multilin D400:
Table of Contents

Advertisement

APPENDIX B: INSTALLING AND CONNECTING DNP3 I/O MODULES
D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
Table 57: Site ground connection examples
Module Type
DC Analog Input Module
Digital Input Module
Control Output Module
Combination Input Output Module
After site ground has been connected, you are now ready to connect power, and DNP3 link
cabling to the DNP I/O module. See "Connecting DNP3 I/O modules (Low Voltage)" on
page 178 or "Connecting DNP3 I/O modules (High Voltage)" on page 180.
Site Ground Connection
47
48
49
97
98
Site Ground
63
64
65
129
130 131
Site Ground
50
51
52
103
104 105
Site Ground
47
48
49
97
98
Site Ground
GE INFORMATION
50
TB1
99
100
2.05 mm (12 AWG)
12 AWG
green wire
GND Wire
Site
66
TB1
132
12 AWG
2.05 mm (12 AWG)
GRN GND
green wire
Site
53
TB1
106
2.05 mm (12 AWG)
12 AWG
green wire
GRN GND
Site
50
TB1
99
100
2.05 mm (12 AWG)
12 AWG
green wire
Green Wire
Site
177

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents