Two Circulation Pumps In Sequence - Danfoss ECL Comfort 296 Operating Manual

Application a230
Hide thumbs Also See for ECL Comfort 296:
Table of Contents

Advertisement

Operating Guide ECL Comfort 210/296/310, application A230

5.15 Two circulation pumps in sequence

Application A230.2:
See also the Installation Guide (delivered with the application key)
for application specific connections.
By means of Schedule 2 (placed in Common controller settings) it
can be arranged to control the shift of 2 circulation pumps.
Control of P1 is based on the cooling demand and determines via
K1 the ON / OFF control of the pumps P2 and P3. P2 and P3 are
related to the output of the Schedule 2.
Schedule 2 is factory set to change every 21 hours during the week.
This can give an approximate even ON-time for each of the two
circulation pumps.
The factory setting can, of course, be changed.
00.00 - 21.00
Monday (M), 1:
21.00 - 21.00
Monday (M), 2:
21.00 - 21.00
Monday (M), 3:
18.00 - 24.00
Tuesday (T), 1:
24.00 - 24.00
Tuesday (T), 2:
Tuesday (T), 3:
24.00 - 24.00
Wednesday (W), 1:
00.00 - 15.00
15.00 - 15.00
Wednesday (W), 2:
15.00 - 15.00
Wednesday (W), 3:
12.00 - 24.00
Thursday (T), 1:
24.00 - 24.00
Thursday (T), 2:
24.00 - 24.00
Thursday (T), 3:
Friday (F), 1:
00.00 - 09.00
Friday (F), 2:
09.00 - 09.00
09.00 - 09.00
Friday (F), 3:
06.00 - 24.00
Saturday (S), 1:
24.00 - 24.00
Saturday (S), 2:
24.00 - 24.00
Saturday (S), 3:
00.00 - 03.00
Sunday (S), 1:
Sunday (S), 2:
03.00 - 03.00
Sunday (S), 3:
03.00 - 03.00
116 | © Danfoss | 2017.05
Relay 2
Relay 3
M
T
W
T
When Start and Stop times are set to the same time, there is no
comfort period.
Schedule 2
Inverter
Days of the
F
S
S
week
Time
VI.LG.H4.02