Installation; Overview - Vent-Axia 405215 Advance S Installation & Commissioning Manual

Sentinel kinetic advance mvhr
Hide thumbs Also See for 405215 Advance S:
Table of Contents

Advertisement

Installation

Overview

The following instructions are intended to help prevent potential hazards and installation should only be carried out
by a qualified electrician and installer. This booklet covers both the Kinetic Advance S and SX models. The control
systems are identical on both models but there are some differences during the commissioning that the installer
needs to be aware of.
NOTE: we advise installers to fix all mains and sensor wiring along with any internal accessories prior to
fixing the MVHR unit in position, leaving approximately 500 mm tails to allow for internal routing.
Before installation of the unit
Inspect the Unit
When taking delivery of the unit, check the items delivered against the enclosed delivery note. Inspect the unit for
damage in transit. If in doubt, contact Customer Services. Each box contains a Kinetic Advance Heat Recovery
unit, a wall bracket, & an accessory pack containing, miscellaneous fixings and product documentation.
Lift and Move the Unit Safely
On page 7 check the weight of the unit that you are installing. Always use appropriate lifting techniques and
appliances when moving heavy equipment.
Check Site Requirements and Safety Notices
Check that the physical and environmental conditions for the site meet, or exceed, the requirements detailed in the
Technical Specification on page 7.
Read and observe the safety notices listed in Warnings and Safety Information on page 2.
Unit Installation
The Sentinel Kinetic Advance units are typically installed on a wall in a kitchen, utility room, storage cupboard, roof
void, or similar and the wall should have sufficient strength to support the unit.
The unit may also be floor mounted, either directly to the floor or using standard kitchen cabinet feet. Ensure that a
secure, firm, flat, and level surface is provided to place the unit onto when using the floor mount method.
Take into consideration the position of the electrical services and the condensate drain.
Ensure there is adequate access at the front of the unit for installation, operation and maintenance.
It is recommended, a local disconnection mains is installed within 1m of the unit to facilitate future maintenance..
The unit MUST always be mounted vertically with ducting exiting vertically. Do not use this unit as a support for any
other equipment.
Select Unit Orientation
The unit is supplied from the factory with the condensate exit (and the atmosphere spigots) to the right of the unit,
when viewed from the front. If the unit is configured in the opposite orientation with condensate exit (and the
atmosphere spigots) to the right, then the condensate installation will need to be reversed.
Sentinel Kinetic Advance MVHR Installation & Commissioning Instructions PN 408651
Installation
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

405216 advance sx

Table of Contents