Instrument Switch On - Ecom j2kn pro Operating Instructions Manual

Hide thumbs Also See for j2kn pro:
Table of Contents

Advertisement

6. Instrument switch on

At temperatures below 10 °C the gas channel plate will
be heated with mains power connection – connect
Always position the probe in the exhaust pipe once
Display con-
trast adjust-
able with
F1 and F2
Once the control module has been switched on (key <I/0>), the main
menu is displayed.
8 sub-menus with the following functions are displayed (non-visible
sub-menus can be called up scrolling the arrow keys):
pro
ecom-J2KN
instrument to mains power!
the calibration phase is over!
Always use a filtering system as per our
recommendation for combustion plants
firing solid combustibles!
Gas analysis
Mean value
Pressure
Soot..Oil trace
Data processing
Adjustments
Control
Diagnostics
Bar indication
radio quality
accu voltage
(charging status)
Bar indication
transfer quality
Page 11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the j2kn pro and is the answer not in the manual?

Questions and answers

Table of Contents