Repair Procedures; Introduction - Genie Z-30/20N Service Manual

Hide thumbs Also See for Z-30/20N:
Table of Contents

Advertisement

April 2016
Section 4
Repair Pr oc edures
Observe and Obey:
Repair procedures shall be completed by a
person trained and qualified on the repair of
this machine.
Immediately tag and remove from service a
damaged or malfunctioning machine.
Repair any machine damage or malfunction
before operating the machine.
Before Repairs Start:
Read, understand and obey the safety rules
and operating instructions in the appropriate
operator's manual on your machine.
Be sure that all necessary tools and parts are
available and ready for use.
Use only Genie approved replacement parts.
Read each procedure completely and adhere
to the instructions. Attempting shortcuts may
produce hazardous conditions.
Part No. 139378
Z-30/20N • Z-30/20N RJ • Z-34/22 • Z-34/22N

Repair Procedures

Machine Configuration:
Unless otherwise specified, perform each
repair procedure with the machine in the
following configuration:
• Machine parked on a firm, level surface
• Key switch in the off position with the key
removed
• The red Emergency Stop button in the off
position at both the ground and platform
controls
• Wheels chocked
• All external AC power supply disconnected
from the machine
• Boom in the stowed position
• Turntable secured with the turntable rotation
lock
Service Manual
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-34/22nZ-30/20n rjZ-34/22dc

Table of Contents