Finish Commissioning The Boiler; Re-Starting After Prolonged Shutdown - Thermal Solutions Arctic Installation & Operation Manual

Table of Contents

Advertisement

2. Confirm the high and low gas pressure
Arctic Installation and Operation Manual
switches are functioning and are adjusted
to prevent over firing or under-firing of
the boiler.
3. Verify that all safety and operating limits
and flame controls are operating
properly.
4. With boiler running, front door closed
and all jacket panels attached, measure
oxygen (O2) and carbon monoxide (CO)
concentrations in the flue gas and flue gas
temperature. Compare results with values
given on factory fire test report supplied
with boiler.
5. Repeat if necessary.
4.8

Finish Commissioning the Boiler:

Reconnect any wires from the external control
1. Test function of external control system.
system, if applicable.
2. Place system control back in normal
operation, if necessary.
4.9
Re-Starting After Prolonged
Shutdown
Use the following recommendations prior to
re-starting the heating system after prolonged
1. Perform Pre-Start-Up Inspection by
shutdown.
checking all gas, water, air intake and
venting connections to ensure proper,
leak-free connections and that the water
and gas lines has been cleaned
completely.
2. Ensure that combustion air piping, vent
piping, and terminations are free of
obstructions.
3. Inspect the boiler for damage and loose
wire connections.
4. Remove all flammable material present in
the vicinity of the boiler.
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web:
Phone: 717-239-7642 Fax: 877-501-5212 Email:
30
Form: 2435
Revision: 8
Date: 9-19-2016
www.thermalsolutions.com