System Start-Up; Concert Boiler Control Display Navigation; System Check; Power The Boiler - Thermal Solutions Arctic Installation & Operation Manual

Table of Contents

Advertisement

Arctic Installation and Operation Manual
4

SYSTEM START-UP

WARNING
Completely read, understand and follow
all instructions in this manual, Concert
Boiler Control manual, and all other
component manuals supplied with this
boiler before attempting start- up.
4.1
Concert Boiler Control Display
Navigation
This boiler is equipped with a color
touch screen display, which presents
information and control options in a
page manner. Pages are arranged in a
tree structure through which the user
navigates up and down to arrive at
the desired function. The page
descriptions and a complete list of the
available control parameters are
provided in a separate instruction
manual for the Concert boiler control
(Also supplied with the boiler).
Most pages have a Home button
in the top-left corner of the screen.
The Home button returns the user to
the Home page to view real time
operation of the boiler.
The back button
user to the previous page.
A padlock
the screens that require the user to
enter a password to change the
parameter. An unlocked padlock
indicates the correct password has
been entered to change the
parameter.
The user can access the following
icons from the Home screen: Menu,
Thermal Solutions, 1175 Manheim Pike, Lancaster, PA 17601 Web:
Phone: 717-239-7642 Fax: 877-501-5212 Email:
28
returns the
icon will be shown on
Info, Status, Adjust, and Help. It is
important that the user become
familiar in accessing additional icons
that are not shown on the home
screen page.
NOTICE
Refer to the Concert Boiler Control
manual for detailed instructions on the
use of the hydronic control and display.
4.2

System Check:

1. Verify that the venting, water piping, gas
piping and electrical system are installed
properly. Refer to installation instructions
contained in this manual.
2. Confirm all electrical, water and gas
supplies are turned off at the source and
the chimney/vent is clear of obstructions.
If boiler is controlled by an external
control system, this system must be
temporarily disconnected. The local
boiler controls should be allowed to
operate the boiler.
3. Confirm that all manual shut-off valves
between the boiler and gas supply are
closed.
4.3

Power the Boiler:

Turn on the electrical supply to the boiler and
circulation system at fused disconnect switch.
Ensure that the circuit breaker switch is in the
"ON" position.
4.4

Power the Circulators:

Turn system circulators on and purge air from
the boiler and system piping.
4.5

Pressurize the Fuel System:

1. Open the manual gas shut-off valves
located upstream of the field supplied gas
www.thermalsolutions.com
sales@thermalsolutions.com
Form: 2435
Revision: 8
Date: 9-19-2016

Advertisement

Table of Contents
loading

Table of Contents