Genie ZX-135/70 Service And Repair Manual page 86

Hide thumbs Also See for ZX-135/70:
Table of Contents

Advertisement

Service and Repair Manual
Boom Components
Note: Use the following chart to identify the
description of each LCD screen control button used
in this procedure.
Plus
Minus
74
Previous
Enter
ZX-135/70
6 Point Calibration procedure
Note: Use this procedure for software versions
before 4.01.
Note: For the 2 Point Calibration procedure,
proceed to step 33.
1
Push in the ground controls red Emergency
Stop button to the off position. Do not turn the
key switch to the off position.
2
Turn the key switch to ground controls.
3
Open the ground control box.
4
Locate the calibration toggle switch at the top
of the ground control box. Activate calibration
mode by moving the toggle switch in the left
direction.
5
Temporarily install a control box door retaining
fastener between the door and the box to
prevent the control box door from moving the
toggle switch while calibrating the machine.
6
Remove the key from the main key switch.
Insert the key into the bypass/recovery key
switch and turn it to the bypass position.
Note: The angle sensor calibration values will not
be saved correctly unless the key switch is in the
bypass position and the calibration toggle switch is
activated.