3
Getting Started
3.3 PANEL MOUNTING
1. Cut a hole in your panel, as
shown in Figure 3-4. For
specific dimensions refer to
Figure 3-5.
2. Insert the meter into the hole.
Be sure the front bezel gasket
is flush to the panel.
3. Slide on mounting bracket to
secure.
4. Proceed to Section 3.4 to
connect your sensor input and
main power.
14
CONNECTOR
LABEL
PRODUCT
LABEL
GASKET
FRONT BEZEL
Figure 3-4. Meter - Exploded View
CASE
1,5
R(.06)
45,00 + 0,61/-0,00
(1.772 + .024/–.000)
4 PLCS
92,00 + 0,81/–0,00
(3.622 + .032/–.000)
NOTE: Dimensions in Millimeters (Inches)
Figure Figure 3-5. Panel Cut-Out
PANEL THICKNESS
6,4 (.25) MAX
0,8 (.03) MIN