Connection Procedure; Wiring Plan - Vega VEGAWELL 52 Operating Instructions Manual

Submersible pressure transmitter with ceramic measuring cell 4 20 ma/hart
Hide thumbs Also See for VEGAWELL 52:
Table of Contents

Advertisement

Direct connection
Connection via VEG-
ABOX 02 or VEGABOX 03
Connection via housing
Direct connection
VEGAWELL 52 • 4 ... 20 mA/HART
5.2

Connection procedure

Proceed as follows:
1. Wire the suspension cable up to the connection compartment
2. Connect the wire ends to the screw terminals according to the

wiring plan

Connect the VEGAWELL 52 according to the description in the oper-
ating instructions of the respective VEGABOX.
Proceed as follows:
1. Unscrew the housing lid
2. Remove the sealing plug and insert the installation cable through
the cable entry into the plastic housing
3. Loosen the screws with a screwdriver
4. Insert the wire ends into the open terminals according to the wir-
ing plan
5. Tighten the screws with a screwdriver
6. Check the hold of the wires in the terminals by lightly pulling on
them
7. Tighten the compression nut of the cable entry gland. The seal
ring must completely encircle the cable
8. Retighten the housing cover
The electrical connection is finished.
5.3
Wiring plan
Fig. 10: Wire assignment, suspension cable
1
Blue (-): to power supply or to the processing system
2
Brown (+): to power supply or to the processing system
3
Shielding
4
Breather capillaries with filter element
The suspension cable is already preconfectioned. After shortening the sus-
2)
pension cable, fasten the type plate with support again to the cable.
5 Connecting to power supply
4
1
2
3
2
2)
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents