7 Maintenance and Care
7.9.15 Injection valves
Injection valves must be checked by your service
specialist.
7.9.16 Control cog belt for drive motor
The toothed belt must be replaced by your service
specialist.
7.9.17 Electrical equipment
Battery
Follow the instructions of the battery
manufacturer when taking a battery into
service for the first time.
•
The acid level should be approximately 10 mm
above the plate edges. If necessary, top up
with pure distilled water.
•
Only check the battery with the engine
switched off.
For
maintenance-free
check is not necessary.
Disconnecting the battery
•
Disconnect first the battery ground cable, then
the positive cable.
•
Remove the clamping bracket (59/1).
•
Lift out the battery.
Installing the battery
•
Place the battery into the machine and secure
it with the clamping bracket.
•
Connect the positive cable (+), then the battery
ground cable (-).
Ensure that the negative terminal is
attached to the negative pole (-) and
the positive terminal to the positive
pole (+).
In winter, in particular, take care to ensure that the
battery is well charged.
Lighting and warning equipment
•
Check the function of the lighting equipment.
•
Check the function of the indicator lamps.
•
Check the function of the warning equipment.
94
batteries,
this
Fig. 59 Battery
1
L824-059
TL80