GarrettCom magnum 6kl Installation And User Manual page 55

Managed edge switch
Table of Contents

Advertisement

Magnum 6KL Managed Edge Switch Installation and User Guide
negative (A-), and the secondary power terminals as negative (B-), positive (B+). The
chassis is earth/ground (GND).
The connections for 125 and 250VDC are made by a fixed cord exiting the
6KL unit. (see Sec. B4.0 for details)
Note: The GND should be hooked up first. The 6KL unit has a floating
ground, so the user may elect to Ground either + or - terminal to suit the
customer's use. Before connecting live power lines to the terminal block,
always use a digital voltmeter to measure the output voltage of the power
supply and determine the lead which is more "+ve potential". The more
"+ve" voltage lead from a +ve or –ve power supply must be connected to the
post labeled "+".
The connection procedure is straightforward. Simply connect the DC leads to
the Switch's power terminals, positive (+) and negative (-) screws. The use of Ground
(GND) is optional; it connects to the Switch chassis. Ensure that each lead is securely
tightened.
C6.0
ORDERING INFORMATION FOR DUAL SOURCE POWER
To order the optional Dual-Source power supply factory installed, add "Dual-
Src-xxxV" as a separate line item following the product model.
Example: Magnum 6KL-48VDC
See the Configuration Guide on the GCI web site at
http://www.garrettcom.com/techsupport/insertion_guides/6KLcg.pdf
for additional information.
www GarrettCom com
.
Dual-Src-48V
.
50
11/09

Advertisement

Table of Contents
loading

Table of Contents