Mira Gem 88 Installation & User Manual page 23

Shower control
Table of Contents

Advertisement

1.3 Drill and plug the fixing holes. Using
the screws provided, if appropriate, fix
the shower control and backplate
assembly into the recess, making sure
that the two retaining screw holes are
at 45° as illustrated. (Make sure that
the shower control inlets are
horizontal with the shower control
outlet at the top).
1.4 Install the hot and cold supplies.
1.5 Thoroughly flush the incoming hot
and cold water supply pipes before
connecting the shower control.
1.6 Make the connections to the incoming
hot and cold water supply pipes and
outlet supply pipe using the appropriate
fittings (install the shower outlet
pipework).
1.7 Turn on the water supplies and check
for any leaks.
1.8 Refit the plastic building-in shroud over
the shower control body and secure
with the two shroud retaining screws
removed in instruction 1.2.
Plaster and tile to the sides of the
plastic building-in shroud (refer to
illustration), when set remove the
shroud, retain the screws for later use.
Make sure that the supply pipework is
able to maintain free movement in a
solid wall and is protected, it is
suggested that each pipe is concealed
into a suitably sized conduit.
Note! If the shower control is recessed
too deep the two shroud retaining
screws will not reach the backplate
assembly and the shower flow control
may foul the concealing plate.
If the cavity seal or shroud have been
removed or are incorrectly fitted, refer
to section: 'Refitting the Cavity Seal'.
Wall Plug
Pipework Set Deeper
Finished wall
surface must
be within these
two lines
23
Fixing
Screw
Building-in
Shroud
Retaining Screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents