FP Postbase Mini Operator's Manual page 14

Hide thumbs Also See for Postbase Mini:
Table of Contents

Advertisement

14
PostBase Mini
PostBase Mini comes with pre-set connec-
tion settings that should work in most cases.
• Press the
button to use these settings.
PostBase Mini tests the connection to the FP
Infrastructure.
If no connection can be established, the wiz-
ard for entering connection parameters is
opened.
• If necessary: Enter the connection para-
meters. If need be, ask your network
administrator for details.
For details on possible settings, please read
the appendix "Connection settings (Over-
view)" in the "First steps" Operator Manual.
Caution! PostBase Mini may reboot several
times during installation. Do not unplug the
machine!
• Enter the Repository-PIN (R-PIN).
• Confirm with the
PostBase Mini now downloads the software
and data, then reboots.
• Follow the instructions on the display.
button.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Postbase Mini and is the answer not in the manual?

Table of Contents

Save PDF