Siemens Synco 200 Basic Documentation page 77

Universal controllers rlu2
Hide thumbs Also See for Synco 200:
Table of Contents

Advertisement

Switching on / off
Switch positions
Note
Two priorities
Configuration
Siemens
Building Technologies
8.4.5
Function check / wiring test
The step switch can be switched directly via the control switch during the wiring
test.
The switch has the following positions:
---
0...100% load
Settings such as INVERS, MIN POS and MAX POS are also effective during the
wiring test.
8.4.6
Priorities
The following 2 priorities apply to the step switch:
1 On / Off during the wiring test
2 Demand-controlled by the sequence controller (preselection in normal
operation) and the IN X external signal (maximum selection)
8.4.7
Settings
Path:
... > COMMIS > CONF > STEP V1
... > COMMIS > CONF > STEP V2
Display
Name
STEP 1
Step 1
STEP 2
Step 2
STEP 3
Step 3
STEP 4
Step 4
STEP 5
Step 5
STEP 6
Step 6
AO
Modulating
output
IN X
Preselection
external
Universal Controllers RLU2...
Aggregates
Range / comments
Activation of step switch and selection of the
number of steps; adjustable values: ---, Q1, Q2,
... (free outputs only)
---, Q1, Q2, ... (free outputs only)
---, Q1, Q2, ... (free outputs only)
---, Q1, Q2, ... (free outputs only)
---, Q1, Q2, ... (free outputs only)
---, Q1, Q2, ... (free outputs only)
---, Y1, Y2, ... (free outputs only)
---, X1, X2, ... (inputs with identifier % only)
77 / 174
CE1P3101en
29.08.2008