Installation; Preparing For Installation; Removing The Ups From The Pallet - Riello 100 kVA Manual

Uninterruptible power supply system
Table of Contents

Advertisement

P
REPARING FOR INSTALLATION
ALL THE OPERATIONS DESCRIBED IN THIS SECTION MUST ONLY BE PERFORMED BY QUALIFIED
PERSONNEL.
The company does not accept responsibility for damage caused by incorrect connections of by
operations not described in this manual.
R
UPS
EMOVING THE
Upon receipt of the UPS, check that the packaging has not been damaged during transportation. Check that neither of
the anti-shock devices placed on the package has turned red. If one has, follow the instructions shown on the package.
Take care when removing the packaging in order to avoid scratching the UPS.
Remove the stretch film wrapped around the UPS, take off
the cardboard lid and the HD protective bag. Take care with
the corner protectors as they are held in place by the lid and
the bag. Then remove the corner protectors.
Remove the adhesive pads placed at the sides of the
display. NOTE 1: The accessories box could be found inside
or above the UPS door.
The appliance must be handled with
care. If it is knocked or dropped it could
be damaged. When moving the UPS,
refer to the following images:
N.B. It is advisable to keep hold of all packaging for future use.

INSTALLATION

FROM THE PALLET
Pallet movement
UPS movement

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

120 kvaMulti plus mlt100Multi plus mlt120

Table of Contents