Kohler 6EKOD Service Manual page 92

Marine generator sets
Hide thumbs Also See for 6EKOD:
Table of Contents

Advertisement

10. Loosen and remove the four controller mounting
screws securing the controller and carefully lift the
controller. See Figure 9-2.
Note: Be careful of the leads and harness
connected to the controller.
1. Controller mounting screws (4 ea.)
Figure 9-2 ADC IId Mounting Screws
11. Note the connections on the back of the controller
and then disconnect wiring harness plugs P1
(35-pin plug) and P2 (8-pin plug) from the ADC IId.
See Figure 9-3.
1. P1
2. P2
Figure 9-3 Controller Connections
92
Section 9 Generator Disassembly/Reassembly
1
2
1
GM79009-A
12. Refer to Figure 9-4 while performing steps 13
to 20.
13. Remove the controller.
14. Remove the junction box controller panel.
15. Disconnect the generator output leads from the
circuit breakers.
16. Disconnect the LO and GRD lead connections.
17. Disconnect the leads to the fuses.
18. Disconnect the connectors to the preheat relays.
19. Disconnect the AC lead connections and the P4
connector to the battery charging module.
20. Remove
the
junction
vibromounts.
box
from
the
four
TP-6774 2/14a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9-11ekozd5efkod7-9efkozd

Table of Contents