Removing The Monitor Board And Spo2 Modules - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

Removing the Monitor Board and SpO
Tool Required
# 1 Phillips screwdriver with torque capability
Setup
This procedure should be conducted on a static mat.
Wear a wrist strap to ground during the procedure.
Complete these procedures in the following order before performing this procedure:
1.
2.
3.
4.
5.
Note:
To reinstall the monitor board and/or SpO
Monitor Board and/or SpO
1
2
9650-0801-01 Rev B
"Removing the Handle" on page 57
"Removing the Printer Module" on page 58
"Disassembling the Main Unit" on page 60
"Removing the Front Enclosure Module" on page 63
"Removing the Display Module" on page 65
After replacing the Monitor Board and/or SpO
Life Cycle Counters" to reset the life cycle counter for the module.
Disassembly
2
Remove the EtCO2 anti-conductive shield
that lies on top of the unit.
Remove six (6) screws to release the
monitor board in the areas illustrated.
Note: During reassembly, torque screws to
6 in-lbs.
ZOLL Propaq MD Service Manual

Removing the Monitor Board and SpO2 Modules

modules, see Chapter 4, "Resetting
2
modules, reverse the steps.
2
Modules
2
shield
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents