Removing The Etco2 And Nibp Modules - ZOLL Propaq MD Service Manual

Hide thumbs Also See for Propaq MD:
Table of Contents

Advertisement

Removing the EtCO
Tool Required
# 1 Phillips screwdriver with torque capability
orange (wooden) stick
Setup
This procedure should be conducted on a static mat.
Wear a wrist strap to ground during the procedure.
Complete these procedures in the following order before performing this procedure:
1.
2.
3.
4.
5.
Note:
To assemble the EtCO
EtCO
and/or NIBP Disassembly
2
1
2
9650-0801-01 Rev B
and NIBP Modules
2
"Removing the Handle" on page 57
"Removing the Printer Module" on page 58
"Disassembling the Main Unit" on page 60
"Removing the Front Enclosure Module" on page 63
"Removing the Monitor Board and SpO2 Modules" on page 71
After replacing the EtCO2 and/or NIBP modules, see Chapter 4, "Resetting Life Cycle
Counters" to reset the life cycle counters for the module(s) that you have replaced.
and/or NIBP modules, reverse the steps.
2
Remove the right side panel (containing
temperature, IBP, and USB connectors) by
removing four (4) screws from inside the
unit.
Note: During reassembly, torque screws to
6 in-lbs.
Remove three (3) screws from underneath
and outside the unit.
Note: During reassembly, torque screws to
6 in-lbs.
ZOLL Propaq MD Service Manual

Removing the EtCO2 and NIBP Modules

67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents